Wednesday, 1 October 2025

Brick laying like mad.

Thursday at Broadway.

 The weather is still kind to us, and we're making hay, laying bricks.

John is now on the north end, and on Thursday he worked on all three walls of this end. If only we had those specials, then we could work on the front, and build up over the windows. We are now as high as we can go along the front, without more specials.

 

Most of John's time was spent on the north end itself. He built up the corner to very close to the top, then filled in the middle. He also worked along the back for a while. But that was because yours truly was making huge clouds of pink dust, cutting bricks, and on Thursday we had a northerly wind, which blew the dust straight at John.

We had both steam and diesel on Thursday. As autumn nears, we got the impression that there were slightly fewer passengers, despite the good weather. But Auntie Wainwright's did well, it's a nice place to hang about and hear the story of the station rebuild (and maybe buy a second hand book?)

 

 

 

 

 

The second half of the back is now also getting near to the top, maybe another 3 courses to go?

 

We were curious to know how the wall would end, so below is a peep at how it went on the main, P1 building. 

  

 





On the first half of the rear John laid the first row of specials, forming the beginning of the corbelling.

We can see here, from the P1 building, that there are three more courses to go. We do have these special bricks. 

 

 

 

Friday at Toddington.

Again using the reasonable weather, we started actually painting the dagger boards on Friday.

 

 

 

They've had two coats of fungicide, and now we are on primer, the first coat of paint.

We sorted ourselves a little production line, with Yours Truly on painting the ends with a brush....

 

 

 

 

 

 

... and Neal, on painting the flat surfaces with a roller.

He laid the boards out in a line, all slotted in with the tongue & groove, so that paint would not stray into the grooves. 

 

 

We were at it all day, treating the 184 boards on pile No.1. Pile No.2 has the ones with increasing lengths, which go on the gable ends. We're about half way there as you read this.
 
 
 
Sounds of a chainsaw alerted us to a tree surgeon removing two conifers in the boundary between us and the housing estate being built next door. There is now a gap (the taller trees are unaffected).
After enquiries made we have ascertained that this is a temporary access to the area behind the featherboard fence, where the builder next door will park his vans for 9 months - and pay rent! That can't be bad, an unexpected source of income for us. 
 
 
Monday at Broadway.
Still good weather, so another day of laying bricks at Broadway.
 
A course of headers, and half a course of stretchers were laid on Monday. A similar amount remains, before we hit the top of the plain bricks, and switch to the corbelling.
 
 
 


Tuesday at Broadway.
 
Idem ditto. Just two of us again. Neal is in Kent, buying a compressor (thinking ahead for the roof assembly and rivetting) and making a tiny holiday of it, visiting a couple of railways in the area. We hope he enjoys himself - there are several GWR engines to see on the K&ESR.
 
On Tuesday John completed the second half of the rear wall of the building, as far as plain bricks are concerned.
 
We received a request from him for a corbelling cornerstone. This is it ! It is likely to go on with the next course, the bricks with the rounded off ends, and upside down.
 

As you can see on the main station building, there are two courses of these bricks, separated by a plain course, and an angular corbel.
In 1904 the roof rested on the top of this, which was several courses wide of solid brick, supported by a thick padstone. Today we can't do that, because of the requirement for insulation. So the trusses sit on a hidden frame. 
 
 
 
 
Wednesday with the Usketeers.
 
A full complement of three today. It was the base of the lamp post that got most of the attention.
 
Paul and Dave replace one of the 3 x 2 slabs that were there before.


Yours Truly was dispatched to cut the second larger, then the two smaller slabs to size. He got a compliment from Paul! They fitted perfectly.


Paul, fitting the last slab around the base.


There it is, all done. Just a small bit more pointing to do next time.
 
A heritage minded PWayer in a passing truck felt that using paving bricks here would have looked better. 
On reflection, we felt that he had a point there. However, we only put back what we found (three concrete slabs) and we were rather too far down the road to change now. If only he had spoken to us last week.
 
 
While Paul and Dave were doing that, we raked out the crack on the inside of the hut, resulting from the shifting of the corner (since underpinned). There was quite a lot of space in there, and lots of loose mortar.
The bit sticking out is just a lump of mortar that was pushed in there; we will replace it with half a brick.
Next time we'll have a look at the outside. (we could see daylight through the crack) 
 

As is our wont, we had a look in the skips after lunch. There has been plenty to save in there as of late. Today it was a bunch of old telephones. Could these not be sold to raise funds?

Dave couldn't resist having a good rummage in there. (Dave is a former BT engineer). He vanished with a cardboard box full.


On our way to the Coffeepot we noticed that the door cill had been refreshed. Previously it was made out of some sort of cardboard, and had almost completely worn away. Now it is made of hardwood, and has brass, slotted screws. Well done, that team!

And a small but interesting fact: We had two coaches of school children today, and in an idle moment the driver of one mentioned that he liked coming to the GWSR, because he got a £5 voucher for our cafe. When he drove to Harry Potter he got a complementary entry ticket (worth over £50) but nothing for the cafe. That Coffeepot voucher is a good ambassador for our railway.
 

 

 

More modern plastic at Winchcombe.

Sadly, we have to report that once more, people aren't singing from the 'We are a heritage railway' hymn sheet.

The early volunteers who built Winchcombe signal box in the 1980s, would spin in their graves if they knew what we would do to their efforts years later. 

 

 

 

 

 

 

A couple of years ago this modern LED was attached to the bricks above the locking room door.

 

 

 

 

 

 

 

 

 

 

That was followed by these CCTV cameras.

 

 

 

 

 

 

 

Then a modern plastic light was screwed to the wall next to the signalman's door.

Just off camera, on the other corner, is an existing small Windsor lamp. Could those functions not have been combined in a believable 1905 style? 

 

 

 

 Then, last week, a tower scaffold was positioned next to the box.


 

 

Our mission: to be 'a living museum'

 

 

Its purpose now revealed: To screw a large plastic LED spotlight to the car park side wall. 

Could extra lighting have been added in a sensitive way? Yes, of course. Here is an example that you can buy today: 

This is a copper Windsor lamp, with a corner bracket, as used on the Toddington goods shed extension. The steam boys took the trouble to get it right.

 

And what is this, on the platform side of Winchcombe station, in full view? A modern, plastic fire alarm box has been attached.

We are not singing from the same hymn sheet here - our chairman has stated, in public, that we want to be the best heritage railway in the UK. These thoughtless, modern appendages are not part of what we aim to be.

 

 

A look over the fence - EA, and the Yeo Valley Trust.

An important shareholder meeting took place on Sunday, to vote on transferring the assets of Exmoor Associates to the Yeo Valley Trust. All former shareholders of EA will now become life members of the trust. The vote in favour of the transfer was carried by a very large majority. This move enables the YVT charity to control the assets of the company that it supported. The previous, private limited company structure needed to change to fit in with its supporting charity.

We dropped down to the meeting early in the morning, to find a wonderful scene of valleys filled with clouds in the early morning sunshine. Chelfham viaduct is just visible centre left.

The meeting took place in the Grow Forward site under the viaduct. 

Much of the damage done by vandals while the site was unoccupied has been made good, except the main admin building, which remains as a shell at the moment, after being set on fire. The site has become a nice place to be again. Grow Forward are keen to work with the local community, and this includes the preservation group looking after Chelfham station, as well as the YVT. The car park filled quickly, with cars from both EA/YVT, as well as volunteers at the station.

 

 

 

The meeting had a long agenda, and lasted for most of the day.

One item was the presentation of this clock, thought to be the original from Bratton Fleming. It was bought by a supporter, and repaired by the YVT.

 

 

 

 

There is no immediate news of trackbed purchases. Two are close to fruition, but have suffered from delays not the fault of the YVT. One vendor died; the other couldn't find the deeds! Both are now on track, and could close any day now. Several others are in various stages of advancement, but further details will not be revealed until something concrete has been signed.

Meetings have been held with Bratton Fleming Parish council, Barnstaple Council and North Devon Council, and all are very supportive of the land purchases, and the possibility of a railway returning to Barnstaple. 

Negotiations continue with th L&B Trust at Woody Bay for the YVT to take care of Chelfham station, but so far without anything positive emerging. Chelfham was bought many years ago, and is living a lonely existence, far from the current operating line, and does not seem to figure in any future plans there. A sale or lease to the YVT seems a sensible move forward to unlock the station's potential. Chelfham is pretty much in the middle of the three miles that EA/YVT have secured in trackbed purchases so far. 

From the meadow on the other side of the viaduct we were able to take this picture of Britain's highest narrow gauge viaduct. It is indeed a lovely structure, all built in white brick.


The viaduct is not in the care of the YVT though, but by the Highways Agency Historical Railways Estate (if we read this right). Sadly, although the parapets were put back in place some years back now, it was not waterprooofed, and this is now beginning to show.



The issue is the same as that of Stanway viaduct - water leakage is seeping down the structure, and is causing bricks to spall.

We also took a snapshot of the water wheel, which is now revealed after clearance of undergrowth.

Behind the main original house there is a pile of lightweight 2ft track. This could be used to install a temporary, say, contractor's style railway, to show to interested parties what the YVT is about, and what the potential is for the local community. After the vote to transfer the EA assets to the charity, the YVT will have 3 miles or so of trackbed, so thoughts are evolving what could be done with that to make it useful.

The house itself is in poor condition, and has not been addressed by Grow Forward yet.

The YVT is looking to recruit volunteers to:

- Run, or populate its website

- Raise funds for trackbed acquisitions, and in the longer term, rebuild bridges. 

- Raise the charity's profile with PR

- Run its 100 club

- Support the charity's engineer

If you think you can offer your services, please get in touch. 


Meanwhile, work has started at Bratton Fleming on erecting the good shed, just prior to the expiry of planning approval. This is now locked in.

 

The site has been cleared, and the old garages removed.

Footings have gone in, and a contractor engaged to put up the shell of the building. The sides will have 6 - 8 courses of bricks, and then timber cladding. The roof will be insulated corrugated iron. 

The YVT has, opportunistically, acquired a Ruston diesel engine, and a carriage, which will be kept inside. There will also be a workshop, keenly anticipated by the working members. 




 

The 6 - 8 courses of white bricks will be in the L&B house style, all being recovered from the demolished Chelfham parapets, which were found lying in heaps on the trackbed downhill from the viaduct.

One member has started cleaning them. Three thousand are needed, and 500 have been cleaned so far. Some help would be nice.

 

Here is a picture of Bratton Fleming station, as it was on Sunday, in brilliant autumn weather. If you want to stay here for a spell you can, but not until next year.

The original station, like Chelfham, was just a modest two room affair, but Bratton Fleming was added to, in order to become a residential home. One room, being very damp (on the left) has been taken down again, the other room (a bathroom currently) has been refurbished, and the conservatory is still in use. The whole building is getting more refurbishment, but next year it should be available for letting.

A panel of track has been put down, for demonstration purposes. The area off camera on the right belongs to an adjacent house, which has been for sale for some time now. The YVT would like to come to an agreement with any owners to split off the former trackbed. As this is at the bottom of a steep hill, it seems to have little added value for the house.

 

It was noted during the meeting that the goods shed is not yet fully funded by its appeal. That was a surprise to your blogger, so here's hoping that they can raise the difference (about £50k if we remember right)

If you want to help, you can by donating here: 

https://yvt.org.uk/donations/donate-bf-goods-shed/ 

 

Wednesday, 24 September 2025

Back to work.

Thursday in the greenhouse.

 A day spent on the P2 dagger boards, made by Neal, with knotting fluid.

 

 

Neal has been very busy cutting out P2 dagger boards for the canopy. Here they are, in the raw.

Now starts the lengthy process of treating and painting them. 

The first process is the application of knotting fluid. There are two piles like this, plus another of sundries. They were all done during the day. 

 

 

Next would be the application of a fluid to prevent (slow down) decay of the wood. For budget reasons we have had to go for raw pinewood, so we will do our best to protect it as best as possible. The same process was used on the staircases.

 

 

It was a long day, but we got there.

In between, we had a look at the action on the station. It was 2807 first thing, with the blue class 47 hovering (as it were) on P2.

 

 2807 was looking good, seen here just prior to setting off.

 On the unloading road was coach W5023 - not sure what it was doing there. It looks recently outshopped

 

 

 

Friday in the greenhouse.

 A second day, facing the quivering pile of dagger boards that Neal has cut for Broadway.

 

 

On arrival first thing at Toddington, we found W5023 from the unloading road about to be transported somewhere by Allelys.

The where was easy to ascertain - we asked the driver. It's Quainton Road.

The why came from a correspondent - it's going to be used for a filming job, and should be back with us in a fortnight or so.

It's all go around here....  

 

 

Then on to the day's task, which was the follow up to the knotting of the dagger boards.

 

 

We had a lively discussion with Neal whether it's 180 units, or nearer 400. 

Whatever the answer, it's an awful lot of them. 

So now the job is to apply fungicide, to prevent rotting. This treatment should make the pine boards last longer. 

 

 

There are always a lot of comings and goings at Toddington, so we don't pay too much attention, but a Mk1 on a long trailer did make us look. 

We spent a whole day on this pile of 184 boards. Painting them is a lot slower than knotting them, but we got through it at the end. Sadly, there is a second pile... There was also talk of a second coat, even a third one. Eek ! 

We had the pleasure of the company of Neal during the day. He's still drilling holes.... 84 holes the other day in the purlins. Doing the holes at the manufacturing stage will save time during the assembly part.

In the picture he is drilling different holes - these are in sets of junction plates that he made. They will join the purlins together, a bit like fishplates.

In other news, it is becoming apparent that we won't be ready to assemble the canopy on site at Broadway this year. That's a bit of a blow, but there are positive elements to the change as well. The reason for the delay is that we are simply not quite ready yet. We had pencilled it in for November, and that is only just over a month away. We still have to paint the whole structure in undercoat, complete the manufacture of the three supporting columns (chiefly galvanising them) and complete the pit for the foundations at the bottom of the stairs, and fill it with concrete.

It now looks like the assembly on site will start next September. Bear with !

On the bricks front there is some progress. There is renewed contact, and we have been promised a quote, based on the sample bricks we took down to the works. 

 

 

Sunday in the greenhouse.

Same job as Friday, treatment of countless dagger boards, now into their second coat.

Any excuse for a little break from the job is a good one, so we walked over to the platform when we heard what sounded like one of the Sulzer engined diesels arrive. 

 

Foremarke Hall was getting ready to head out, and the driver was enjoying a quick, last cup of tea from his can.

This view along the tracks is one of our favourite ones. The line seems to go on forever.....

Walking round Foremarke Hall, it became apparent that it was more that just the class 24, it was the class 20 as well. According to a correspondent, these two used to be allocated together at Eastfield, Glasgow.

 

Once the steamer had left, the pair ran round, and prepared to set off for Broadway. One spluttering, the other whistling.

 

 

 

After both trains had cleared the section, the yard shunter came to collect a rake of wagons, ready for next weekend's event.

A while later it came back with one wagon.

This picture shows it returning from that job. 

 

 

 

 

We went back to the painting job. We've always got our ears tuned for unusual sounds (A400s, old Bentley, Norton cafe racers etc...) and on Sunday it was a sound we hadn't heard before. 

It was a US army truck, a 'deuce and a half'. What prickled our ears was the sound of its turbocharged 7.8L six in line engine, with a characteristic whistle from the exhaust.

 

We managed to catch it on film as it left, so here goes:

We stopped the film at the top of the drive. That gives a shorter film that Blogger will upload; longer ones can't be posted and have to go via a link to YouTube.

Had we filmed a little longer, you would have heard it loudly belting along Stow Road and up the hill to the Cotswolds Edge. 

 

 

Near the end of the day we took this shot of Foremarke Hall arriving from Broadway. What a lovely scene, and one that we have created entirely by ourselves over the years since 1981: Platforms, tracks, footbridge, GWR Hall, water tower and waiting room rebuilt.

Hats off to the members of the GWSR ! 

 

 

Tuesday in the greenhouse

Treatment with fungicide of the dagger boards completed, about 400 boards, coated twice. Phew!

Next will be a coat of primer for them all. 

 

 

Wednesday with the Usketeers.

A full complement of three, and Paul was raring to go. We don't know what pills he's on, but he just could not wait to get the driveway lamp post up.

We humoured him, arranged for a Telehandler, Dave D as driver, and some slings.

 

 

After some wriggling past the tower scaffold in the background, we managed to extract the lamp post from its resting place beside the signal box. 

This one was one of a pair donated by a supporter, from the Frome area. It's twin is already up, at the bottom of the P2 steps. Now this one will go on the island by the station entrance, where one used to stand. 

 

 

Dave carefully manoeuvered the post up the drive, over to the little traffic island between our two gates.

In 1905 there was a pair of wooden gates behind the Telehandler (the cast iron gate posts are still in situ) and these closed off the goods yard.

The right hand side was actually open (we have fenced it off) and led to a fenced area around the entrance to the station. A lamp post stood in the middle. 

 


 

The lamp post went down without too much trouble. The post is a No.2, so 8ft high, with a ladder arm. It is unusual in that it has no casting below ground (usually a 2ft extension) but sits on a concrete pad with 4 bolts. This was a later design alteration, but the above ground look, with the Acanthus leaves, is unchanged. 

 Here it is, in place. It still has to be adjusted to be perfectly vertical.

 

 

 

 

 

 

After being lifted on to its bolts, Dave and Paul inserted shims underneath until it was vertical. Then they filled the space under it with a thin mix. 

 

 

 

The next item of interest is the area around the foot of the post. We took out a full 2x3ft slab to cast the base, so now we have to cover the remaining area with smaller slabs, cut to size.

 

 

 

 

 

This was more difficult than we first thought, because the surrounding kerb stones had moved, and were not parallel. We will sort that next time.

Why put a lamp post at this precise spot? Because we saw that there was one, in this old photograph of the Winchcombe station approach. 

 

It's right in the middle there. You can see how the gates (open) on the right gave access to the goods yard, while the station approach was always open (albeit fenced off from the yard). On the right is the weighbridge hut (with chimney) with coal merchants and acetylene hut adjacent.

There is another lamp post in the foreground, outside the stationmaster's house. We've got no plans for that though.

If you have a GWR lamp post and want to donate it, we'd be happy to come and collect it. You can see that we really use them!

At the end of the day Paul and Dave decided to fetch Maxie the Usk hut petrol mixer, and store it by the weighbridge. Dave hopes to sell the mixer on eBay, unless someone reading this can use it?

We also caught sight of Andy, seen here preparing rail end cut offs for sale. This, and donations to our tool fund by kind readers, have allowed us to buy the Milwaukee electric tools, which have been incredibly popular.

Sales of these rail end cut offs continue briskly, and one can be yours for £25.  Other lengths are available. Door stops, anvils, book ends, there are lots of potential purposes, and you'd be helping the railway.

Then, what do we do at the end of every Wednesday? Join the PWay gang for their end of day cuppa. 

 Atmosphere aplenty. Or did you say orange?

 

 


Broadway on Wednesday.

We called in to arrange the next volunteering days, and see how John and Neal had done.
John's been on forced leave of absence for a couple of weeks recently, so that explains the lack of visible progress.
Now he's back with a vengeance. 


They've been laying bricks both along the second half of the back, as well as, more recently, along the northern facade. This is the one that will have two large poster boards on it. We haven't made those yet, nor found suitable contemporary posters for it. Pressure !

This is a little snapshot of John on the north end. He's used up all the headers we cut in half for him, so that's another job for later this week. 

 

 

 

A look over the fence - Northern Italy.

Not exactly a preserved railway, but readers might be interested in what we saw, in railway terms, during our 14 days away. It's always interesting to compare.

We have seen the three big lakes, so went to stay near two other, smaller ones. The first was Lago di Santa Giustina in the Trentino, and the second was Lake Iseo, in Lombardy, both at the foothills of the Alps. 

Our knowledge of modern stock is somewhat limited, so bear with us if we have limited information .

 

 

The first is an Alsthom TT class ETI 400 set, very modern.

As it happens, both lakes were near a railway line - what a coincidence! 

This line is metre gauge, and runs from Trento up one valley, then along another, to Mezzano.

This is it in our 'home station' of Cles. 

 

 

 

 

 

Your blogger was quite keen to have a go on one, either direction would do, so Mrs. Blogger opted for a day in the town of Trento. We will spare you the tourist snaps, but it's certainly pretty, and as always in Italy, we ate particularly well.

Worth seeing on the station was this 2-6-0 with outside valve chests, a class 625 known as Signorinas, as they are rather elegant.  

 

 

 

 

The narrow gauge terminus is next to the standard gauge one, so you get to see interesting main line stuff too.

 This is a doubled headed freight train crossing the Alps from Austria, loaded with lorry trailers. Innsbruck is the nearest big town in Austria for this train, then Muenchen in Germany, as to possible provenance. The route is known as the Brenner line (from the pass). 

 

 

 

 

 

 

On our return journey on the narrow gauge line we stopped here at Mezzolombardo. We are about to leave the valley of the Adige river, and cross to the next one, of the river Noce. This one has been dammed, to form Lake Santa Giustina. The line crosses the deep gorge of the river right in front of the dam (see below).

 

 

 

 

The next day we took the line in the other direction, further up the line. The scenery here is stunning, as you can see. A bunch of white water rafts floated by here, just before the train appeared.

This line used to run from Trento to Male, and was actually extended in 2002 further up the same valley to the Marilleva ski resort, where we took the picture. Then, in 2016, it was extended again to Mezzana, and there are plans to extend it further to Fucine. 

 

 

This shot shows the start of the 2016 extension, at Marilleva.

Fucine, the proposed new terminus, is at the foot of the mountain in the distance.

We were impressed by the modernity of it all. There has clearly been a lot of investment in the region.

 

 

 

 

 

We had a handy pocket timetable with us, which helped some of the photo opportunities, but sometimes it surprised us.

This previous generation unit was not programmed at all. It stopped, the door opened to reveal a family standing in the vestibule, then the doors closed again and it moved on. Strange.

 

 

The same pocket timetable was consulted for this picture at Mostizzolo, taken just after a heavy thunderstorm had passed over. The expected unit was supposed to come out of a long tunnel from Cles in the trees on the right, but it never. 

Strange as well. Lovely colours though.

As this used to be border country with Austria (which was given to Italy after WW1) there were many castles in the area. 

 

 

The intended castle visit near this station was frustrated by a sign we met at the end of its approach road. It said something like: Did you book a private visit? If not, we're closed. And don't park here, drive back down to the village, and walk up !

All part of the fun. We parked Mrs Blogger at Tassullo, and sought permission to penetrate an apple grove for an attempt at a viaduct picture. 

 

 

Permission granted ! Here it is, taken at great personal risk, as we tetered on the very edge of this enormous, deep gorge, blocked off by the dam (just visible behind the LH pier of the bridge).

The hole in the rock below is the exit of the overflow spillway. 

At the end of an adventurous week we drove our hire car beyond Mezzana up the Passo del Tonale, and back down the other side to Iseo, which is in Lombardy.

 

 

Quite by accident this location also had a railway line.... It ran from Brescia, alongside Lake Iseo and up to Edolo in the foothills of the Alps.

This line was standard gauge, and was also equipped with impressive, new rolling stock. These are Stadler built and diesel powered, what some call 'two rooms and a bath', with two driving trailers separated by a small twin engine unit in the middle.

The station is Sale Marasino, on the lake.

 

 

A little S&T curiosity we noticed is that stations are equipped with three bells. Top right is the classic telephone system bell, while the two lower ones announce the arrival of the train, from two directions. For this there are two shapes of bells: on the left, a sort of cow bell (sphere with a slit in it) and on the right, half a sphere, rather like our block bells. Sadly, we did not hear them ring - possibly an abandoned idea? The stations were by now unmanned, and tickets were sold in a nearby cafe. You had to know that of course, and which one !

 

 

Here too we had the idea of taking a train each way.

Edolo, the terminus up the valley did not appeal, as the flat valley bottom was full of industrial units. However, a short trip to Pisogne at the northern end of the lake was great. We arrived in the ATR 125, and just had the time to snap an example of the previous generation DMU leave the station. 

 

 

 

 

A bit of local industrial archaeology was this ramp, which allowed loaded wagons to be taken across the lake by boat.

The only reason we could imagine was an enormous cement plant on the other shore, which did not have a railway line along it. 

 

 

 

 

 

 

 

What really appealed to your blogger at Pisogne was the up close and personal nature of the line through the town.

Here it is running along the lakeside promenade.

£1000 trespass warnings? Not here.... 

 

 

 

At the end of the promenade the line dived in between two houses. One was a bar.

Idea ! 

 

Shouldn't we set out some tables and chairs so close to our railway line? Some Aperols beside the portal of Greet tunnel would be very popular.

Our intended journey along the other direction of the line, to its terminus at Brescia, was foiled. A week long festival on Iseo island meant that almost all of the parking spaces near our railway station were out of use, and in the end we had to resort to taking the car to Brescia.  

 

 

 

Here we parked up in the citadel on a hill, and to our surprise, found this plinthed locomotive near the top.

It's marked SNFT No.1, and actually used to run on the Brescia-Edolo line until the 1960s, when it was replaced by rail cars.

It was then dragged up the hill to Brescia citadel, where it is described as its 'prisoner'. 

 

A day meandering through Iseo town offered this excellent vantage point from a footbridge across Iseo station:

 

 

It got rather busy below us, as not only did the up and down trains cross here, but a third one arrived, to sow a little confusion among the passengers.

This used to be a junction to Rovato, but the service (according to Google) was suspended in 2018. 

 

 

 

 

People quite happily crossed from one line to another, right in front of the trains. These even left without the familiar warning toot, to which we are accustomed here. It all rather gelled in an easy going manner. No passengers were hurt in the taking of this photograph!

 

 

After all the passengers had sorted themselves out, one unit headed north, and the other, a double Stadler, headed south, to Brescia. 

Where the third one went to was not clear to your correspondent.

 

Once again tickets were sold at a nearby cafe. It seemed that the owners of the cafe were about as well informed about the train movements as we were!

We loved it. 

And another cultural observation: During our two week stay we saw no wheelchairs anywhere (other than at the religious festival on the island), and not a single mobility scooter. 

And no potholes, nor road closures, nor roadside traffic lights for 'safety zones'.

It's another world.