Thursday, 8 August 2019

Diggings at Winchcombe

Wednesday at Winchcombe


 A good turnout today, with 10 attacking the further renewal of timbers on the turnout opposite the new platform, while 4 'Usketeers' scratched their heads over the weighbridge hut foundations.

These would need some scaffolding boards for the 5m x 5m shuttering. Where to get half a dozen scaffolding boards...

A trip to Broadway in the Transit was organised.  After the removal of the P1 scaffolding, some of the company boards were no longer needed there.

Ah - interesting, they've had a go at fetching over a supply of treads from P2, and laid a few out to see what they might look like. Not bolted down yet though.




Seven scaffolding boards were loaded on the Transit, negotiated with the Broadway team.



After arrival back at Winchcombe they were stacked by the foundation excavation. Some more are on the trackbed, so we should be covered now.








The first steps towards laying the foundations were taken today, with measuring out the four corners of the base. A last check was made with the bottom of the cutting leading to the housing estate next door.




After further measuring, it was found that the levels needed digging out further over about half the surface.

We're talking compacted clay here, on a hot and dry day. It was very hard work.





Can you see the Coffepot? No, I reckon it's a bit further over to the left....



As Stevie wasn't hired in today we had to dig and remove spoil by hand, just the 4 of us.

Periodically we would test various areas to see if we had gone deep enough yet. Usually not....








Every now and then we'd stop to admire a passing train, here with P&O but also with Foremarke Hall.
Anyone know why Halls have a squeak on each exhaust stroke, while other GWR locos haven't? Or is it just ours?

Some of the excavated material was dug out by Jim in the foreground, but we were starting to look at the Telehandler used by the sleeper team with increasing interest.




There is growing confidence in the resleepering team, as the number of timbers replaced has slowly risen over the last month from one a day to four today!

Well done that gang. A few helpful words from Bert Ferrule, passing through, also helped this achievement.



A short but heavy rain shower (see the patches on the side of the Toad) sorted the men from the boys. Management retreated to the balcony of the Toad and continued to arm wave, while the workers on the ground plodded on.





Meanwhile, other troops were also working hard.

We met Roger in the yard with a barrow load of concrete blocks.

Whither goest thou, brother Roger?










Roger was on his way here: the stop block by the new goods platform. The return around the back of it needs a lot of them, so Roger was back and forth quite a bit from the back of the C&M workshop.








As he arrived with yet another load of 3 (top right) the others were down in the pit excavated last week, setting out shuttering and reinforcement bars.










By the end of the afternoon all this was in: planks, a mat cut to size, and bent rebar placed at exactly the spaces of the holes in the concrete blocks. The yellow stripes mark where these go, so the theory is that once the concrete is in, the  back end can be built up with blocks which will fit exactly over the bars sticking out.


This mid afternoon shot captures the activity at Winchcombe quite well. On the left, the team building the return around the stop block, behind them under the tree, the team on the foundations of the Usk hut, centre right by the Telehandler, the team replacing timbers on the yard turnout, and in the distance, Bert Ferrule inspecting sections of plain rail, one of which will be put in at Broadway south for a while, to replace the bent switch, which will be sent away for repair by professionals.




After hacking away at clay and shovelling it out of the hole for a couple of hours, we finally concluded that borrowing the Telehandler might be a bit easier. It's not ideal, but let's see if it can help.

Here it is, trying to get out a scoop of the material we loosened.


It worked, at least a bit. We got out two scoops like this, but there is more to go.

We'll have another try next week, from a different angle.

Time was getting on, if we're not at the Coffeepot before 4 o'clock, there's no tea!
Ooof - we made it! Some more than made it, they secured themselves portions of sponge cake too.

As the Growler rumbles by, Rick can't resist it any longer, he's just got to check the Footsie, hit by US trade tariffs on China. If the value of his pension goes down, he may have to pass on that piece of cake.


Mystery picture

Found in a collection of pictures held by the Winchcombe station group, can anyone say what is happening here?

Note that it doesn't have to be Winchcombe. In fact it looks more like the south end of Toddington yard, with those hills on the left. It looks like the leading axle has derailed at the yard throat, but the track on which the gangers are working also looks a bit rough, with the rail jacked clear of the sleepers. The clothing suggests 1910 - 1920s. The picture quality is rather poor and it's not clear whether there are one or two lamps. If one, it's a passenger train, if two (a second over the RH buffer?), a freight.

Can anyone say any more?

Monday, 5 August 2019

Back on line

(Last) Monday at Broadway

A gorgeous sunny day, not too hot, and all 3 of us there. The scaffolders came too (eventually). They came to remove the P1 scaffolding, which we now no longer need, so it can go off hire.

This is where we started from first thing this morning. Scaffolding and Heras fencing up.

We took the fencing down, had a brew, waited.

Eventually they did come, so to stay out of their way we decided to fetch down another (last?) lot of T&G from our store under the canopy.






This all needs lugging down to the painting area, then knotting, then primering.

The longer you leave it, the hotter it gets!






By lunch time the scaffolders had finished, and a beautiful butterfly emerged from the chrysalis. The skeleton of the steps looks quite elegant. We now have to put on the sides, and the treads. Sorting out the treads from a big pile on the other side looks like the next job. They are replacement treads fitted in HIA by BR, but of a very high quality wood, and most are still very serviceable.





















You can't leave steps unattended for 5 minutes but some clown will try to go up them.

No Peter, No! Wait until the treads are on. (and the bridge open for business)

This is a trackside view; soon the steps will be veiled again by the Heras fencing panels, but at least it all looks a lot more manageable now. No doubt the missing spearhead fencing panels could be put in place now too.

Wot, no holes in the LH dagger board?

















Neal made a start with the mouldings on the 4th and final side. At the end of the day he had all the large pieces on; just the arch over the top and a short bit down the roof of the centre span to go. Then that's another job ticked off.



Yes, you saw that right, one dagger board escaped the strict scrutiny of our assembly team and was made, and painted, without holes.

All the holes are made up out of two half-holes, so it's these that are missing.

Neal has it sorted though. Here he has a pattern for a hole (can you get these?).







The missing two half holes were soon drilled, and the hole counters were satisfied.

This is the 4th moulding run, almost completed as well in the picture.





Broadway seemed a busy village today. First this Chinook scraped itself over the treetops. We heard the CHOP-CHOP-CHOP coming, hence the picture.

Then all afternoon there were emergency vehicles screaming around us. No idea why. Something on Fish Hill perhaps? At the end of the afternoon we saw two patrol cars hurtling down station road, and a fire engine returning to Evesham. Mysterious.



Finally, a pleasant bit of heritage news. Upon opening the booking office was adorned with plastic leaflet holders, as a temporary measure, we heard.

We looked around on the internet for something more suitable for a 1904 station, and found this example after a Google search.

Could someone make us one of these?




Dave of the Broadway gang bravely accepted the challenge.




This is what he built, isn't it splendid! It's made out of scraps of hardwood that he found.

You see it here in the raw, being varnished.

Alex in the C&W workshops has kindly agreed to letter it.

We can't wait to see it with its gold letters on.





Tuesday.

The phone line to the blogger country pile suddenly stopped working. Disaster! It's amazing how dependent we are on the internet today. At first we suspected a router upgrade, and a reboot often cures that. But not this time.

A call to BT resulted in an off site line test, which pronounced that there was nothing wrong with the BT line, so the fault must lie with the house. A visit from a BT technician would cost £86, else a self help video was offered to trace the supposed fault in your house. We had £86 (well, what else can you do?) and the technician duly came on Friday. The Wednesday blog was now 2 days overdue.

The technician found the fault, and - surprise! - it wasn't in the blogger country pile after all, but in BT's line down the lane. No can fix today though, a cherry picker is needed. Monday at the earliest.

Rural Broadband, eh?

So today we are back on air again, after a bit of a trying week. The news updates now follow.



Wednesday at Winchcombe

No action on the Usk hut foundations.

Nearby, timber replacement took place on the yard turnout.




There are a lot of rotten timbers on this particular turnout (not on the main line) and as the bed around the timbers is as hard as concrete, removal and replacement of the timbers is slow.

Here Dave is releasing one of the chairs.





You just get going nicely when the shunter appears, a bit unusually for this side. After the diesel gala the carriage rakes had to be reconstituted. We step aside...




The next timber is a GWR throughbolter one, so we cannot undo it. Of course, why not make it a bit harder still?

The only way to get the old timber out is to split it down the middle. Hence the bars in the picture.






TOOOOT - here comes that shunter again. Hot diggety, is there no peace? We step aside again. We thought we were safe here, in the sidings. Ha!






After digging out the rotten timber, we wriggle in a new one. Or rather, a better one, although one 'good' one promptly split in half when we screwed down the bolts. Out it came a second time.




In between were the ordinary trains, which ran on the adjacent loop. That didn't affect us directly, but we stood aside anyway. This time it was heavy tank 4270, with the fireman just checking that he really has 8 on after leaving the platforms. You never know.





With your blogger's back still fragile after a 'twinge' a few days earlier, we took it carefully today, and decided to rid the site of these enormous rocks. They were scattered about  the tracks, in between the sleepers. There were more by the signal box too. Wonder what brought them here in the 1980s?

They have been dropped behind the Usk hut platform wall as in fill. There were 5 barrows of these boulders!







By the new platform there was a surveying team during the day, and later the area around the stop block was investigated.




The rest of the platform is going to be finished by C&M, and, taking the wall site in hand, they decided to go for a different construction for the return around the stop block.

The second hand sleepers laid in previously were removed again.




The area at the rear was then dug out, ready for a further bit of concrete foundation to be poured.








Meanwhile, a third timber was being manhandled into position at the yard turnout. In the foreground is a pile of debris, the remains of the three timbers dragged out.

Another pause for a passing train, this time Foremarke Hall at its head. With the topping and tailing going on to deal with the Broadway run through, there were also some diesels about.

Tweet! Get this man a bag of bird seed.




Getting the new timbers (this really is a new one) screwed down was quite tricky, with Rob on the left perching on the end of the bar to get the maximum amount of leverage from it.








We always aim to hit the Coffeepot just before closing time (well, after closing time would be pointless wouldn't it, but we did manage that too once) and then you get to see a steamer heading north while you slurp.




The first one who makes it to the Coffeepot gets the order in - 15 volunteer cups of tea please!

Not much profit in that, but you do get our labour for free, and it's a small price.

Martin was 'mother' today and did the honours. John can barely hold himself back, while a really impatient teacup is being proffered from the left, in the hope of an early fill.

Just wait your turn, mate!








This being the last train south of the day, it's a diesel that rumbles in right next to us, today the 'Green Goddess' Growler.

The smell of tea seems to have brought the second man out of his chair, you saw that here first!






Friday at Broadway


Much more painting, it's getting a bit tedious, but at least the weather is on our side, so it's 'make hay while the sun shines'.

Neal has made the round bits for the highest moulding area off site, so when he arrived they were ready to fit.






The P1 scaffolding of course has been removed, and instead the first spearhead fence panels were parked in their approximate positions. The P2 scaffolding is due to go in 10 days or so, not long now. We need to off hire to save costs.





Here's that final and tricky curved stretch of moulding in place, fillered and with a bit of primer on.










Saturday - a day out at Bloxham.

To build a heritage station you can't just go out and buy kit, it isn't there when you want it. You have to strike when it comes up, even if you can't use it straight away. This is how we bought lamp posts, door plates, lanterns, benches, V boards, cast iron letters and many other original GWR fittings for Broadway over the last 8 years.

So we keep an eye on the various auctions as they come up. Bloxham on Saturday was reputed to have a very rare set of GWR cast iron crowd barrier posts for sale.

Of the 4 GWSR stations, only Broadway has a set of these as it should.

The auction had over 100 items, and they were being rattled through at a rate of 140 an hour. Keep up, at the back there!

Bloxham is not the pace for hugely expensive locomotive name plates, it's more for smaller items, or interesting kit. So we had a good mooch around, see what else there is.


This trio of scripted GWR seat ends, originals, appealed. They are of the earlier pattern, with pierced back supports.

They went for £220 for the 3, cheaper than the price of two new ones.

The picture shows them at our favourite shotblaster's premises, where they will get a  good clean and a zinc coating.



A surprise find was this PLATFORM No 1 sign, an original in excellent condition and ready to hang.

Now Broadway didn't have platform numbers, hardly necessary when the trains always stop at the same platforms and there are few passengers.

However, with the large numbers of passengers we have today our station staff expressed a wish for a Platform sign. Where it will be used is still open, but if we don't use it, it can always be sold on. The cost was not outrageous either.






We just tried it out next to that curious box which is appearing on every one of our stations. They are not heritage items though.







Finally, we did bag the crowd barrier columns, phew! They are in the same condition as those found in the debris at Broadway. We took them straight down to the workshop at Toddington to be cleaned up.

Where will they go? It's not been formally decided yet, but an idea being floated is to move the Toddington shop to better and larger premises, and then move the non-authentic ticket hatch in a platform side window back into the area of the shop, which is in fact the old booking office/stationmaster's office, with the middle wall knocked out. So shop, customer and authenticity would benefit. But remember, it's just a good idea at the moment.

And could we resurrect the 1st class waiting room as well? Now that would be fun.

Also by the Toddington workshop, the foundations are being excavated for the long awaited proper loco mess room.



Back at Broadway, we found Stevie starting work with the trench that will run down P2. This will hide the signalling cable that has been laid out here.







Later he decided to work at the northern end, by coincidence just where we were having our tea.

He knocked over a signal cable support, but Neil C forgave him for that (at least in front of us, we don't know about the severe kicking he might have received once out of sight)




While Steve was working the mini digger on the platform, we walked along the track to stay out of harm's way. Just as well, as we found a wristwatch in the P2 4 foot, just opposite where the locos uncouple from their train.

This is now the second time we have found a wrist watch there!

Anyone lost a wrist watch at Broadway? 

Glad to be back! See you again soon.