Wednesday 29 December 2021

One week to go

Tuesday on the footbridge steps

Just the two of us, and a damp and windy start. It left us a bit non-plussed. We need dry surfaces now, for painting, and for the application of the silicone sealant in the reassembly. What to do?


 

 

In the hope things would dry out as the rain faded, and in quite a breeze, we decided to group the painted boards in sets by number, to make the reassembly easier. We then took them up to the far end of the centre span.




 

 

Neal then spotted a large articulated delivery truck down on Evesham Road, which had (fortunately) stopped just short of the road bridge. That has an authorised height of passage of 14 feet; the truck was 14 foot two. Neal helped it reverse into the public car park, and then go back from whence it came. Phew!

The close call made us look at the footbridge again, and it struck us that there had been several minor strikes in the last few days. These have been mostly in the Evesham direction, coming out of Broadway. That's on the left in the above picture. The wasp stripes are crumpled in numerous places, but there is no damage underneath - the collision beam has done its job.

In the Broadway direction (inward, on the right of the picture) the wasp stripes have recently been bent upwards by a pair of objects, one of which has also scraped under the collision beam on both sides. You can see a darker stripe under the letter 'D'.

So far so good, but it remains frustrating to have to see the number of throughtless drivers who seem to be completely unaware of the height under the bridge, and the size of their load. The artic that came to a stop today was certainly not the first. We can be grateful that he did, but it is also a fact that he drove past the clear warning (actually prohibition) sign coming off the roundabout.


 

 

Back to the job in hand. Later in the day the wind had indeed blown off most of the accumulated water droplets, and Neal was able to start work on the last two remaining sections of the structural woodwork on the Malvern side.







Here he is, mid afternoon, on the last section.

Just one more piece of timber to go.





This is the view up the steps, in an increasingly sunny light. It was almost pleasant in the afternoon..

At the end of the afternoon, as the light began to fail, Neal completed the reassembly of the structural woodwork on the P2 steps. We were about to start reapplying the boarding when we realised that we needed to insert little dowels into the screw holes that were now evident (water collects in them) and in a rare effort to clean out the back of his van, Neal had left them at home. Well, it was nearly dark anyway.



 

We did a test fit with the first board. This is of course now cut to size and shape, treated with fungicide, primered, undercoated and otherwise painted 'n' times, so those boards are ready to go. If we had the little dowels.





What happens next?

Well, excitement is rising, as the scaffolders for the last part of the P1 canopy are coming on Tuesday 4th January. Will we complete the boarding first? That depends on the weather, as here again, we need dry surfaces so that we can apply the silicone sealant and keep it all waterproof.

Once the scaffolding is in place, we will prepare the end of the existing canopy for the arrival of the last 6m. This involves taking off some of the corrugated iron sheets, the current extension pieces, security camera and the temporary plywood sheeting over the gable end. Many people thought he canopy was finished when we opened, but that plywood end was the giveaway. There is a final section, to link the station building with the footbridge steps, give passengers a dry walk all the way around, from one platform to the other, and out of the station via the wicket gate at the side. That, on the original station building, was the main way in.

So, the scaffolding goes up on Tuesday the 4th, and a week later the actual construction begins, when the kit of parts, prepared over many months two years ago, arrives by lorry with a large HIAB from storage in Toddington. Work will then be pretty intensive over several weeks, as we have just two months to do the whole job. Hope the weather plays ball. It looks good to start with, according to the forecast.



Off site we have prepared one of the signs that will go at the bottom of the steps.

The rail posts to hold it up are already in place, so all we need now is the protective canopy over the top, and it's ready to go.




 

 

Note that the text 'requests' people to cross the line by the bridge. 




We went to some trouble to find the above version of the text (and were helped by a kind supporter), as later versions are a bit more blunt, like this one, spotted at Carrog:





 

 

Some readers may be aware that moves are afoot at Toddington to fit the new site entrance with a pair of proper GWR style gates, gate posts, and spearhead fencing. They will replace the current ugly albeit temporary Heras fencing panels, which are there to discourage unauthorised access to our site whenever it is closed.

 

 

 

Quite by chance we came across this original GWR crest on Tuesday. It was once attached to the gates of a GWR motive power depot.


Do you recognise it?



 

 

It's the GWSR company logo, isn't it?

In fact it is said that the GWSR company logo was inspired by precisely this crest, so we thought it would be fun, and pretty much authentic, to have two replicas made for the new gates planned for Toddington.


The current owner of the cast iron crest, a supporter of the railway, has very kindly lent it to us, so that 2 replicas can be cast from his original.

The back is interesting. It's a big cast iron boss, divided into 4 quarters. These allowed it to be attached to the centre of the gates, where the two diagonal braces crossed.




 

 

We are now in the process of having two copies made for Toddington. Who ever imagined that such crests were still around? What a happy coincidence that an original has turned up, just as we were thinking about having copies made from photographs.

 

 

 

Wednesday with the Usketeers.


Just three of us today, two down on our usual strength. The weather was a bit dire to start with, but the heavy rain soon fizzled out, and all in all it was an excellent day for laying blocks. Not too cold, sunny, and the blocks were damp, which is what the mortar likes.



We started here, filling in a gap between two quoins laid in last time. In the picture some suggested 4 inch blocks have been placed - the nearest was deemed a bit low. The corner quoin is 9 inches high, and there aren't many 9 inch high plain blocks, so we have to make them up out of a 5 and a 4 inch one.

 

 

 

 

Once we were happy with the selection, Dave bedded them down, and soon there was another layer added - just one short of the top of the window here.





John spent the day ferrying in spoil from the heap round the corner, as Dave was emptying a load of mix into the barrow.

The spoil is being dumped between the foundations and the platform edge, to give us a nice level surface on which to place the trestles, when we get round here.

As it's a bit cumbersome to move the trestles, we have slightly changed the M.O. Instead of moving round the walls and adding blocks where there is an opportunity, we will now do more work in a single area from the same trestle. That's currently in the NW corner, where you can just make out Dave through the window. We have one trestle inside, and one out.

 

 

We had a visitor from the PWay today (Bob, if you must know) and he was swiftly roped in to help get the quoin, which Dave is holding, on to the corner by the door frame.

Then we let him go again, and their team went off to CRC to continue with the turnout renewal there.





With a bit of chiseling to size we managed to squeeze that last quoin in under the top of the door frame. 

Then, again, we needed two rows of blocks to make up the 9 inch height between the two corners. Dave is just bedding down the last one in the picture.



 

 

So that was two rows on two outside faces bedded down. Our usual and talented backer-upper Jules wasn't there today, so it was up to Dave to back up on the inside of the same corner.

Here he is just fitting one of the rougher blocks to the inside by the door frame.


 

 

During the day there was a lot of shunting going on, in and out of the yard and into the station.

The Toddington yard shunter had come down with a bogie flat, which was put into the yard to start with.








After quite a bit of work, involving the shunters from both Toddington and Winchcombe, a rake of PWay vehicles was made up and parked in platform 2 in the station. This comprised a rail wagon, several Dogfish, the Shark brake, mess coach and several tool vans. The picture here shows the train at the close of play.


From P1 at Winchcombe, the Usk hut can be seen to be growing slowly but surely. Since we were allowed to return in the spring after lockdown, we haven't really missed a day, so progress is steady, a new bit every week.

You can see Dave in today's corner, using up the last bit of mortar for the day on backing up. That always swallows a lot. In the original hut, the backing up and infill in between was quite haphazard, with lots of voids and loose material.

This is the overview at the end of today. Dave has been working in the far left hand corner, and with the blocks laid up against the top of the door frame, we are just over 6ft above damp course there, and about 20 inches or three courses below the top of the wall (or wall plate level).

Another close of play shot shows how far John got with barrowing in the fill. He's nearly at the end of the platform side, but we might make the fill a little wider as well, since we don't just need room for the trestles, but somewhere to stand next to them. It's a slow but steady job.

 

A little extra bit at the end of the post: 


 

It's a little gingerbread house made by the blogger grand children and their mother (well, principally their mother, the grand children helped by continuous sampling of the building material as the construction proceeded).


Does the shape of the gingerbread house remind you of anything? Square construction, single storey, one window in the gable end, chimney above?



Yes, it's just like the Usk hut! 

Sadly, the gingerbread version was demolished, but the real, life size model will rise again, you can count on us!


Happy 2022 to you all, from the Usketeers.

See you again next year.


15 comments:

  1. Can't wait to see the canopy extension over the next couple of months, the footbridge really is a great achievement. I'm pleased to see the news about the gates at Toddington, and the monogram (from Malvern Road perchance?) is perfect.
    It's been a long time since the p'way tool train ran, where's it off to, Toddington for winter works?

    ReplyDelete
  2. A great blog...happy New year guys....having a roof on the hut gets ever closer.

    ReplyDelete
  3. Wishing you, Jo, and the team a great 2022, and may the weather gods smile on you, both for the footbridge boarding, and the canopy extension. Really looking forward to the reports.

    ReplyDelete
  4. Congratulations on all your achievements in 2021 Jo et al, they are a joy to behold. I hope I may be able to join in during the forthcoming summer to help you further the restoration of the line. Too many other major problems to solve first!

    In the early days the GWR did not seem to concern itself with authentic restoration, Broadway has changed all that and I hope one day it will be possible to rectify some of the unfortunate builds such as CRC's excuse for a Signal Box along with the New Station Buildings. I share with Jo the ambition to restore authentically and marvel at the new effort to achieve it.

    Wishing you all a Happy and most importantly Healthy New Year

    Regards

    Richard Symonds

    ReplyDelete
    Replies
    1. Thank you for your support, Richard. I could sure do with it. Often it's like trying to swim upstream. The 'anything is better than nothing' from the 1980s is still deeply embedded.
      Broadway shows what can be done. Now, how about CRC modelled on it's neighbour, Bishop's Cleeve?

      Delete
  5. Good progress as always, hat off to you all. I've mentioned this before regarding the bridge, 14ft is not 4.2 metres, it's 4.267 metres. Which is the correct height?

    ReplyDelete
    Replies
    1. Rounding is the only way to get something noted quickly, so 4.2672 would be farcical. 4.2 metres converts to 13' 9 11/32", so that would also be farcical.
      The best to appease you would no doubt be 4.25 metres, as I believe feet and inches takes precedence over metric on bridge heights.

      Delete
  6. It's looking good jo happy new year to you and the team

    ReplyDelete
  7. I heard in the past that Midland Red D9 double deckers went under the Broadway bridge, they are 14' 5 1/2" so did the level of the road rise after resurfacing? Lowering the road 6" or so would make a difference.

    ReplyDelete
  8. Many thanks for keeping us up to date again this year with all your hard work.

    ReplyDelete
  9. Did the GWR gate boss come from the Malvern Road loco shed gates? It looks very familiar.

    After closure Malvern Road yard became a builders' merchant. The gates (and engine sheds) were retained. Both survived for many years. The gates were a local landmark.

    The site was cleared fairly recently for a new housing estate. The loco sheds were demolished and the original GWR spear top fencing which surrounded the site cut up and donated to the Vale of Berkeley Railway, who presumably have it stored in fragments at their Sharpness Dock site. I'm not sure what they plan to do with it. Berkeley station is currently being rebuilt, but this was a Midland Railway structure, not GWR. I have no idea if the GWSR ever expressed any interest in the fencing.

    I'm not sure what happened to the gates. I'll be glad to know if they were saved, although it does seem curious that the GWSR wasn't given first refusal (or perhaps the GWSR *was* given first refusal...and refused?)

    Here's a 2009 Google Streetview photo of the gates in place. The two warehouse buildings at the far end of the row are the engine sheds, disguised with modern cladding. The shed at the far end is the original 1906 shed; next to it is the 'new' shed, built in 1942. Everything you see here was demolished in 2017.

    https://www.google.com/maps/@51.9004637,-2.0942797,3a,37.5y,125.68h,88.98t/data=!3m6!1e1!3m4!1sHbK41jCd4dIehiNjJm3IkA!2e0!7i13312!8i6656?hl=en-GB





    ReplyDelete
    Replies
    1. The gate boss came from another set of gates.

      The inspiration for a set of replica plates did indeed come from the Malvern Road gates. The VoB was very kind to let us look at their set of gate bosses, and we measured and photographed one. However, quite by chance we were offered the loan of an original, and this is by far preferable to the foundry making the copy. The sets at Sharpness were either broken, or rusted on to the gates and not easily removable.

      The VoB hinted that they might be persuaded to let two of the 4 gates go, but they are damaged. They were intact at Malvern Road, and must have been badly handled somewhere. Hence we decided to go ahead with our original plan to make a new set in house.

      We did look at Malvern Road in 2016 when the gates were still in situ, but the then owners of the site were not very helpful, and as we had no mandate from the GWSR anyway, we did not press the matter. There were no original gate posts, and the fencing was not of the style helpful for Broadway.

      Delete
  10. Think the warning signs for the bridge need to be altered to 13'2.

    ReplyDelete
  11. At Kidderminster(SVR) car park they have a pair of gates, with the crests on, in working order

    ReplyDelete
    Replies
    1. Thanks, we are planning something similar.

      Delete