Wednesday 8 February 2023

Great news!

An extra day on the Usk hut.

We're putting in as many days as we can while the scaffolding is on hire, so last Thursday saw three of us back on the roof - and elsewhere in Winchcombe.

 

 

 

Before getting the slates on the Cotswolds side all the way to the top we needed to complete the fixing battens, which Paul is measuring here.


Dave then nailed them down, leaving the way open to resume slating, except that we had another job pencilled in for today as well.




The old floor from Usk was pretty much smashed, with only one or two of the original slabs still intact, and quite a few seem to have been replaced with concrete ones, which wasn't pretty. So with the help of our grant from the Trust we invested in a pallet of newer stone slabs. On Thursday we went to get them. The reclamation yard is only just around the corner from the railway.



We got the pallet put on the truck by the yard, but how to get it off again? We needed the Telehandler, but where was it?


It was last seen going down the B4632 out of Toddington yard (where the PWay have been using it, and will need it again on Saturday) but the Telehandler wasn't at Winchcombe. It's proving to be rather elusive these days.


 

  

 

 

 

 

We decided to get the slabs anyway, and unload them all by hand under the tree on site.

They seem to have come out of somebody's garden, they're all covered in moss and earth, so will need some cleaning before we lay them inside.

 

 

 

Interesting things, those reclamation yards. But not cheap, their stock turn is naturally slow, so that needs financing. 


 

 

 

 

What do you think of these? Two pallets of diamond pavers, they could look authentically railway somewhere. There are over 400 of them in these two piles. Where could they improve our railway look?



 

 

Anyway, those were not in our Trust budget, so we will leave them to one side for the time being.

So, back to the farm.


Here Paul trimmed one of the edges of the Malvern side roof, where the traditional way of trimming slates with a row of holes had failed for once - they broke off at an angle, and we wanted a straight edge.



 

 

Before finishing off the top few rows, Paul put on the edges, which have to be specially cut - with those rows of holes again, this time successfully.





 

In between times yours truly painted the Ogee gutters cleaned on Wednesday with a first coat of Hammerite.


Antique guttering looking nice and new again. A stop end can be seen on the plank behind the gutters. We need 3 more!

We still need two 6ft 3 inch cast iron down pipes, has anybody got some?



Then, finally, Dave was able to get to work nailing on slates again.

In the foreground is a vital piece of equipment - the slate holding up stick. They're getting a bit out of reach now, so near the ridge, and with this length of batten we can push the slates this way and that.

Paul is out of sight on the left, calling out the position: Up a tad, down a tad... we need to keep to a straight line, something Dave on the ladder can't see.




At the end of the day the Cotswolds side was close to being done. We actually stopped only because we ran out of nails.

To finish the slates we need to build up the chimney, it doesn't stick out quite far enough to complete the slating and the ridge tiles. We need a small extra scaffolding lift here for that. There are about 15 courses of bricks to go still.








Saturday on the Didbrook relay.

The best turnout ever - 20 volunteers! OK, including a contractor, but it sure was crowded in that mess coach.


 

The provision of doughnuts must be a draw, or is it the hard work? It is certainly motivating to be on a project, so much better than jacking and packing, and waiting for trains to be out of section.

Today we had 6 luxury doughnuts, and some yummies baked by David - the second time now. We hope this becomes a habit...



 

Further up the coach it was the classic doughnuts, mostly strawberry, but one elusive packet of custard filled ones, a personal favourite.

We sat and waited for the Transit and the Telehandler to join us, then we could get to work.




With 20 volunteers progress is doubled or even trippled, as we can split up into different teams.



You can see four of them here:

- Plating up (in the foreground)

- Clipping up the rail (solo man)

- Drilling rail (middle distance) and

- Cropping rail (far distance.)

Each team allowed the next to progress a bit further.

 

 

The cropping team was left with a growing hole that the JCB had to sort out.
 

Drilling new holes with a jig that has several options for size and type of rail.

Finally there was keying up. We mostly used the curly Mills keys (these were once oak wedges) but when those don't fit tightly enough we use an upgraded key called a Panlock - that doesn't fall out any more.

In the picture is a complicated puller to get the often recalcitrant Panlocks in. You can hit them with a keying hammer, but as they are springy, failure to hit the sweet spot results in a loud clang and a bleeding shin.

The puller is a neat invention, but demands a different skill of its own. We find a start made with the puller to stabilise the Panlock, and finishing off with a whack from a good old fashioned keying hammer works best.


A fifth team took the Transit to Stanton where the extension contractors asked us to remove the pads from a farmer's occupation crossing. Those are big, heavy rubber pads, but with them in the tamper can't pass.


 

 

 

On our site at Hayles the JCB went down to the halt to remove the rails released last week, and then to pull out and stack the sleepers.







 

The growing pile of 'economy' sleepers was stacked in the cess nearby. They still need to be taken to Winchcombe yard for storage, and possible re-use in sidings there.






 

Not every replacement S1 sleeper could be used by the way. This one was actually laid out but was detected by the quality control and removed again, before everything was fixed up and hard to move. Good thinking!

It's actually broken in half, with a hairline crack. You don't see that so often, those chairs are usually fairly robust.





The clipping up team made steady progress during the day. It's pretty tiring, as two volunteers confessed at the end of the day.

Normally we swap jobs around a bit, you don't always have to swing the hammer. You can lever up the sleeper with a bar, which involves the relaxing job of sitting on it until told to stop...







 

Here's a general view of the Didbrook relay site in the latter half of the day. Grey, but not unpleasant. The sleepers and rail are down up to three lengths from the start. The last 3 panels will be fitted with wooden sleepers to ensure proper block insulation, but the wooden sleepers intended for there haven't arrived just yet.



Back at Hayles and now at the end of the day we found all the rail out and the sleepers gone, including three under the existing track


Looking the other way you can see that the trackbed has also been graded. It isn't quite ready yet, as the necessary laser wan't immediately to hand.

Hayles Abbey halt was looking well looked after, although the roof of the hut was rusty. It could do with a protective coat of paint there.



Saturday Night Fever!
On the way back we found Bert Ferrule working with Tom in the JCB and 'tweaking' the track into a better curve.

We also noted that a tree branch had fallen into culvert 15A. Must have been quite a wind to fall this far across the fence. Our drainage gang is now aware and will sort that.


Our last shot of the day shows how far we got with cutting, drilling, plating and clipping up. One more pair of rails is needed here, and then those three panels in wood.



Great News for Broadway!

Last week we reported on the upcoming surfacing of a part of P2 at Broadway. This work is being funded by the Trust. But now it's official - there is a lot more to it than that, the Trust has actually agreed to fund the construction of the P2 waiting room as well, and informed the volunteers yesterday. This was the subject of a proposal by the canopy gang a while back, and we can now reveal that in order to beat expected year end price increases, all the steelwork for the canopy and the internal steel structure of the building was purchased just before the end of last year.

Broadway P2 steelwork being stored on a MACAW in December.

We had to keep that one under our hat for a while as agreed funding isn't everything, and there are still a number of minor obstacles to overcome. Two spring to mind:

- we need to ask for an amendment to our original planning permission. What we have was for the non-authentic 'box section steel' type building, as originally intended for P2, by the same builder/designer. If you liked the canopy extension with its big lamp at Broadway, you will get an idea of what we now plan for the waiting room on P2. It's going to be a lot more authentic.

- In order to remove spoil, bring in materials and place a crane for the canopy steelwork we need a haul road in the neighbouring field alongside our Malvern property line. Our neighbour has now very kindly agreed to that, and as part of the deal a lamp post was moved on Evesham road.

The state of play at the moment is that we have a draft drawing for the planning, but it still needs some detail amendments. When complete, we can make the application. Depending on the timing of the consent, the haul road and foundation work could start in late spring.

Over the months, years even, the railway has supported the canopy gang quietly behind the scenes. In this way we have been able to source:


- all the heavy duty 1.1mm corrugated iron sheets, powder coated, for the roof work. These are now no longer available in the UK, only thinner sheets which are not suitable for us.

- all the special aluminium extruded glazing bars for the glazed panels.

- One large and one small replica 'gas' powered canopy lamp, paid for by a supporter 5 years ago (there's confidence for you!)

- all the GWR style signage (door plates, V board, Passengers are requested to cross etc) 

- two GWR indoor benches (another, upholstered one would be nice though)

- and not forgetting, 7 tons (!) of steel for the roof and its internal supporting frame.

 

Some of the new bricks required were already ordered way back together with those for the main building. We will need to order a complement though.

As we are still settling the final architectural details of the planning support drawings, here is a picture of what there was, during demolition in November 1963.

Broadway waiting room in 1963.
Note the two posts on the end - the stairs descend between them. For P2 the stairs and building will be properly aligned, so you'll get the original layout. We have almost completed making new the posts already.

The new building will be longer than the original, as the P1 building is longer now. That will keep things in proportion. How much longer? It became clear to us that any adjustment in the length will have to be in multiples of the trusses overhead, which are 7m apart. So we have gone for one extra truss, and underneath a simple doubling of the door/window arrangement at platform level. So there will be two rooms, each with a fireplace at the end. One can serve as a waiting room / exhibition space, the other as a mess room for the FoBS. That will also allow us the remove the mess room container at the end of P1, and free up that space for a possible reinstatement of the horse dock, perhaps with an interesting vehicle on it.

On the far end, as you can see, is a lower wall, and that used to house an open urinal. At Toddington P2 that space has been converted into a store and roofed over, so we will do the same. There is plenty of toilet availability on P1, and the installation of foul drainage on P2 is problematical/expensive. The modesty screen will be maintained of course, to give the same appearance.

There is currently no requirement for outside funding, although as the build progresses there may be opportunities for individual items, e.g. the two slate fireplaces, or the lamp tops along the platform. We'll get back to you on that as things firm up.




 

Meanwhile, inside the brand new Broadway signal box the levers sit unused, rusty, and covered in spiders' webs.

It's a big disappointment for those who put in all the effort to build it, and to get it looking right.









Wednesday with the Usketeers.

 A bright sunny day, but with an ice cold start well into the minus figures. We were just thinking how lucky we are to enjoy this spell of good weather, right at the time that we are putting the roof on and slating it. Imagine the result in rain and high winds.



 

Today we asked the scaffolders to come back and give us an extra lift around the chimney.

We watched them from below, and were amazed at the practised accuracy shown by the way they threw clamps to each other. Not a single one was missed. If a clamp had dropped on to a slate, that wouldn't end well. But we were in safe hands.



Romeo, Romeo, wherefore art thou...
As soon as they had gone we were up there like rats up a drain.

Hi there, readers! We can see you....

 




 

 

And how do you get up there anyway?

Luckily there was a sign pointing the way to the extra ladder to the garrett. 






 

 

Today we continued with the slating, almost completed during our last working day. We are still doing two days a week as long as the scaffolding is up, just to make sure we don't overrun.



 

 

With Jules back on the team the penultimate row was quickly completed, making use of the 'slate nudging stick' invented last time.

Handy, that is.





View of the chimney base, as is, from above.

A survey of the area, from the new, higher scaffold.

The scaffold tower, seen along the ridge line.

Jules can be seen with the 'slate nudging stick', while Dave perches on the ladder.


 

 

Elsewhere in the PWay yard chaired, wooden sleepers were being loaded on to our bogie flat, shortly after delivery. They are for the 3 panels left to do at Didbrook.

Now they need to go up there by train.





 

 

Yours truly was back on paint stripping of cast iron, with painting in between times, and almost all of the second hand stuff we have is now clean, and most of it painted too. One item has a lengthy crack in it, and we have taken it home to drill a hole into the end of the crack to stop it lengthening. But where is the end? We will try tomorrow with some flour, to see if that can act as a tracer of the crack's path. Any other home remedies out there?


At lunch time things were warm enough to take out the seats and sit in the sun.

Have a hot cross bun, Jules. Don't mind if I do.

Paul was looking after himself here, with a little board to cut open his pie, on to which some mustard was spread. 

We have all the refinements here...




 

 

Then it was back on to the roof, where we can see Jules and Dave fitting the last row on the second side. Then the roof will essentially be slated, both sides, but for some details.






Once the bogie flat was loaded with the 75 or so sleepers needed at Didbrook it was fetched out of the PWay yard by the C&W 03.


We see it here alongside P2 at Winchcombe, ready to go.

Shortly afterwards the wagon was propelled to Didbrook, and left there for Saturday's work. The 03 then shuffled back to base.




At the end of the afternoon the final row of slates was up, and you can see here how Paul has placed a ridge tile to show us what it will look like.

Most likely we will have to re-visit the reclamation yard for some more, as on closer inspection the 9 ridge tiles we have are in many cases damaged.






 

This view was taken from the scaffold tower at the end of the day as well.

It shows what there is left to do: place the ridge tiles, and build up the chimney some more, so that slates can be cut to fit around the base of it. There will also be lead flashing here.




The gap left at the top of the two slated sides of the roof, which will be covered by the ridge.

Here's the Usk hut basking in the sun, now fully slated, and the scaffold tower ready to go for the chimney.

We'll be back on Friday to make a start on it. Friday is a warmer day and won't be followed by frost, so that is a good day to mix up some mortar.




27 comments:

  1. Brian Drinkwater8 February 2023 at 20:41

    Fantastic news about Broadway. Having a longer waiting room on P2 is an excellent idea. No one can predict the future and having extra space will no doubt come in useful at some point. I do worry though that p2 at Broadway will not be as appreciated as much as it should be when it is finished due to the timetable only allowing for one train in the station like it does at CRC. Other than special events, and an extension to Honeybourne how often will the platform actually get used?

    ReplyDelete
    Replies
    1. There is the possibility for a Winchcombe-Broadway DMU shuttle in the future, having platform 2 available would make that easier.

      Delete
    2. Perhaps in the future a mini extension and shuttle service to Willersey would provide business for platform 2.

      Richard

      Delete
  2. Great news. Finally Broadway gets a finished station. Something I mentioned a few months ago was that the windows on the main station building have much larger pains of glass in them than the original. Would it be difficult to add a wooden baton across the front of the piece of glass to make it appear smaller and is this something to consider for p2? When I last visited the station it was the only ‘modern’ detail which really stood out for me. Jim G

    ReplyDelete
    Replies
    1. You are right, and that is perfectly possible, but I've never been able to persuade anyone to actually do it with a moulding of the right shape.

      Delete
  3. Great news regarding the P2 building at Broadway. Will look out for donation opportunities here. Good blog as always.

    ReplyDelete
  4. One item has a lengthy crack in it, and we have taken it home to drill a hole into the end of the crack to stop it lengthening. But where is the end?

    Jo .

    Nick can weld Cast Iron. I'm not sure when he is back from visiting his daughter in Perth but, from what has been going on recently in Western Austrailia, hopefully, he won't return 'glowing in the dark'.

    We do have access to the equipment for Non-destructive Testing. However, you'd need to 'form a queue' for at least a month or two. Winter shutdown = busy - busy.

    ReplyDelete
    Replies
    1. Thanks Ken, I'll try the flour idea first, might come back for the weld. It's an odd crack, right in the middle of the pipe, doesn't quite get to the end...

      Delete
  5. This is a real red-letter blog- the Usk hut all but complete, and P2 at last officially on the starting blocks! I think it's marvelous that so much of the materials needed have been procured already. You must feel really vindicated that the struggle for authenticity has finally won the day. Brilliant news. I'll bet FoBS are dead chuffed that they'll be getting a proper staff room as well.
    I will be chipping in for the fireplace fund, at least.

    ReplyDelete
    Replies
    1. and I have some house coal to fill it but must first extracate from deep in my garage - a job for the summer time!

      Delete
  6. Uplifting news all round, scaffolding included. Regarding the guttering, are the down pipes rectangular or round & will they terminate with a shoe or water butts? Floplast manufacture cast iron effect rainware & if painted with Hammerite, could look the part. https://www.guttersupplies.co.uk/cast-iron-effect-gutter-ogee-c-60/
    https://www.guttersupplies.co.uk/cast-iron-effect-gutter-ogee-c-60/?p=2
    Best wishes,

    Perry

    ReplyDelete
  7. Very good news about Broadway. And very good work on the Usk hut - the slating is very well done.

    It's possible to buy new blue diamond paving bricks, but the present-day versions don't seem to be as crisply moulded as the old ones.

    A good place to see some originals laid by the Great Western is Carlton Place in Cheltenham - a rather grand name for a small side road alongside the railway embankment. The road was realigned when the line was built, and a new pavement of blue diamonds was laid - with blue clay kerbstones, too. The survival of this original surface in a world of Tarmac is quite amazing, really.

    ReplyDelete
  8. Great work on the Usk hut and great news on Broadway P2. I hope the planning dept doesn't cause undue delay. Any chance of Broadway signal box being commissioned at the same time do you think?

    ReplyDelete
  9. I am so glad to hear that P2 at Broadway is going ahead. The downside is that I will have to wait several years to see it! I wondered how you would get equipment and material to site, and had not thought about a haul road through the field. Hopefully, it won't need too big a cut in the embankment to reach the site. Regarding the planning application I was confused about whether one was actually required for the P1 building. I thought that railways (even heritage ones) had rights to build appropriate infrastructure for their operations. Anyway, we can all help by looking out for the Wychavon District Council planning website notice of the railway's application, and writing a supporting note for the application (possibly stressing what a positive thing the restored station has been for Broadway).

    ReplyDelete
  10. Excellent news on all fronts. Lots of foresight shown to aquire materials ahead of time. Should give you/us excellent blog content for the next few years. Look forward to helping fund another fireplace!

    ReplyDelete
  11. Excellent news on the news regarding P2 but please work together to ensure that security and any modern paraphernalia is discussed and part of the design now rather than added as blatant after thought. It's easy for me to say from my armchair but I could sense the disappointment when all the excellent work achieved by the one team is undone by another team. That camera on the end of the canopy still makes me cringe, in camouflage paint or not.
    A huge well done to all involved.

    ReplyDelete
  12. I too feel great joy at the news of P2 at Broadway going ahead. A great idea to give the workers a mess room on P2 and remove the portakabin. Will avidly read for when the possibility of a 'horse dock' may be constructed.
    Also the Usk hut too gets better and better. wonderful work there.
    Regards, Paul.

    ReplyDelete
  13. The building arriving on Platform 2 will be a fantastic and fitting completion of the Broadway Station Project. I support other comments regarding suitable integration of 'modern' equipment into the build. I read in the latest Newsletter that the GWSR Board have agreed to a Shop at Broadway. "....the shop having a cabin on Broadway platform. This will be a temporary measure until such time as a permanent building can be constructed." Has any thought been given as to what this new building will look like, could the Shop be incorporated into the Platform 2 Building? Now is the time to sort this out, before plans are finalised and building starts.

    ReplyDelete
    Replies
    1. John We have put forward the idea of incorporating a shop in the platform two buildings, but a number of reasons why it would be unsuitable to do so have been used as a reply. People entering the station by train will be looking to go into Broadway or waiting to travel from platform 1 staying on that side, access having to cross by the bridge or barrow crossing.
      Neal

      Delete
    2. I requested a dialogue on this, and was told that the shop would be a wooden shed like the one next to it (the Friends of Broadway's bric-a-brac shop.), This would be a trial, and if successful, consideration would be given to a proper building combining the two. I certainly endorse that, as the current shed detracts from the 1904 image.
      My idea for such a building would be the 1908 station building at Wilmcote, or one derived from it. That is in the Broadway style, but with a shorter canopy.

      I can see the logic of a toe in the water first. Will the sales of that shop make the effort worthwhile? And cover its purchase cost? Will it affect sales of the Bric a brac shop?

      On the other hand what is the risk that it will be yet another shed, and on the day there isn't any money or desire to create something more permanent, and in the style?

      Delete
    3. I feel a shop at Broadway will go the same way as the one at Cheltenham did, it seems people arrive for the train they want or get off and go and not spend time buying things from a shop! I just hope the shed that we were told was temporary and for during covid for refreshments at Cheltenham will be got rid of soon.

      Delete
    4. Maybe the construction of the horse dock could provide space for, let’s say, 2 mk 1 coaches which could be used as a shop removing the need for an additional building at great expense

      Delete
    5. Neal & Jo, thanks for your replies. If the trial with the shed is successful and a permanent building is planned, would it be possible to make it large enough for the Bric-A Brac Shop to be included and get rid of that shed as well?

      Delete
    6. The site of the original horse dock has been curtailed by the sale of a slice of land by BR to the adjacent B&B. There's still enough land left for a shorter version of it, but it wouldn't be longer than one coach, and would have to be approached from the north, not the south and reverse as before.

      Delete
    7. John,
      Yes the idea is to combine the two sheds, or at least consider it.
      The risk is that people move on and there is no money, or will, to do it on the day.

      Delete
  14. Tree branch over the down side (inlet or Cotswold side) of culvert 15A at Didbrook removed by the Drainage team yesterday (Thursday 9 Feb). Fortunately it landed on the low mileage wing and the headwall, so was not causing any blockage. {Andrew}

    ReplyDelete
  15. I always had the ambition for the shop to be integrated into the Platform 2 building and to remove the shed from the platform but progress on Platform 2 is really excellent news. The only question that remains is why it took so long?!!

    ReplyDelete