Thursday - an extra day on the roof.
As we don't want the risk of a scaffolding hire overrun, we put in an extra Usk day on Thursday. What a lovely day it was too - crisp and cold, with strong sunshine. That made photography difficult, but we hope you get the idea.
First of all, a cheery 'Morning All' from the Usk gang. It may be cold, but the sense of humour remains strong.
On Wednesday we laid out the roofing felt and battened it down. Then we measured up the first side, and put up the first few slates.
This is where we started from on Thursday. Half slates along the bottom row, followed by full sized ones over the top.
Once the sun was on full beam, we treated ourselves to an early morning coffee and chewed the fat.
We were amazed to see that it was not necessary to put the fixing nails through a hole, the nails could be hammered in anywhere, and went straight through the slate like cardboard, without breaking any. Amazing - who knew?
Along the side of the building yours truly was painting the Ogee guttering in Hammerite.
More gutters and some smaller pieces remain inside, awaiting strippinmg of old paint.
Winchcombe yard was busy today. A contractor was digging several trenches to trace a reported water leak. This was eventually found, deep under the tarmac, and with some difficulty. Well done that team.
At the same time an artic appeared with two bogies on board. In the picture it is navigating the tricky turn from the side of the workshop to the back of the barn.
On the PWay side of the yard we found the bogie flat, formerly filled with recovered 'economy' sleepers. These have been unloaded, and stacked in the background. More await loading at Hayles.
When the 03 spluttered into life and hooked up the wagon, we thought it was going to be taken out up to Hayles.
But no, it was in the way of some carriage shunting, so was pushed out of the way (and later back to its original position).
Back at the hut the slates were increasing in number.
In the picture the base of the chimney is being reached - but that is the easy bit.
How to do the middle?
This gap is called the verge - it will be filled with mortar in due course. |
The answer to how to reach the middle was a ladder laid across the battens. That spread the weight.
Here is Dave, nailing in another one. Amazing how the nail goes right through, without the slate cracking.
When the last reachable row had been done, Dave had to resort to using the ladder.
That worked fine though, just a bit more fiddley.
This was the scene at the end of the afternoon. Almost at the top. Doesn't it look professional? All thanks to Paul, 50 years in the trade. He knew all the tricks and wrinkles.
The slates nearest the camera need to be trimmed still.
Saturday at Didbrook.
Minus 3 1/2 on arrival, minus 2 degrees on departure at 4 o'clock. A cold day then. And misty too, although Toddington seemed to be a sunny isle, at least until lunch time.
Toddington in the mist at 08.45 |
Simon and Mike, with the foothills of the Cotswolds in the background. |
A dozen volunteers met in the car park and slowly made their way down to the train parked at Didbrook 1 bridge.
At Didbrook, the PWay train was waiting for them, as well as - a Portaloo.
It was used by one volunteer, but his experience with below freezing temperatures was not a happy one.
He wouldn't go into further details, so we shall spare you those.
Eventually a dozen volunteers were assembled in the mess coach, together with Tom, our JCB operator for the day.
During our few days absence, a contractor had cleared the trackbed of old ballast, and levelled and rolled it. It was now ready to lay track back on, which was our job for the day.
'How does this work then?' |
When we laid the Broadway extension we used lifting jigs for SHC sleepers, which do not have chairs, just hoops. At Didbrook we are using concrete sleepers with S1 cast iron chairs, which makes them much heavier. The chains also need a different kind of hook on the end, which we did not have. So a lifting jig had to be hired in, but it was too small to lift more than two sleepers at once, and the full weight also exceeded what the JCB could manage. So in the end we could only lay two sleepers at a time.
Here is the cleared and levelled trackbed at Didbrook, with 15 panels taken out.
Of course we wanted to start at the other end, so all the tools had to be humped 1/4 mile. Par for the course around here...
We got to the Hayles end, dug the ballast down to the right depth (the contractor couldn't get right in here) and lifted in the first two sleepers.
How much space is a spacer? Bert Ferrule measures... |
It took quite a bit out of our day to set this up. Our spacer rig was pretty much used up on the Broadway extension, so we couldn't use it on Saturday, we had to make up individual spacers out of scrap wood.
At first we laid the first two sleepers, but after consultation it was decided to go back three more.
These are being dug out from under the next panel by the JCB in this picture.
All the rail ends on this stretch will be cropped, to deal with 'dipped ends'.
Once the three sleepers and associated ballast had been removed, we were able to insert two replacement (heavier) sleepers. The space for the third one would have been taken up by the end we cropped off.
New holes were drilled by Tony and Tim later.
Once we got the beginning and the spacing sorted out, progress was pleasingly rapid, especially in view of the fact that our sleeper jig could only place two at a time.
A funny thing happened during lunch - the lights went out! We stepped out of the mess coach into unexpectedly thick fog. Given the early sunshine, we thought that the sun had burned its way through, but new supplies of fog were found. That made the atmosphere icily cold.
Our contractor Tom was new to the railway, and relatively new to the JCB (he was more of a 360 operator, he confessed) but as the line of sleepers got longer and longer, we got used to each other and the operation went smoothly, without a hitch.
We did have a problem with the giving of directions. If you say left, whose left is it? Our modus operandum on the Broadway extension was to shout 'MALVERN' or 'COTSWOLDS' depending on the side we wanted the boom to swing. ('BROADWAY' and 'TOD' were other compass options.) But our JCB operator confessed that he didn't know in which direction the Malverns actually were. 'You're not from around here, are you?' we posited, 'so where are you from then?'
'Evesham' came the reply...
The JCB approaches with another pair of dangling concrete sleepers, over half a ton's worth. |
As our starting point receded into the fog, we did a quick count of how many we had laid - 90 sleepers! That felt good.
Near 4 o'clock we had to call a halt, as the faint yellow glow behind the fog was starting to disappear over Cleeve Hill.
We decided to call it a day, and did another count.
We are working to a deadline, and don't forget that at some point we also have to relay the 3 panels we took up at Prescott, to allow the bridge works to take place.
And in just a few days contractors will start work on the Broadway extension, dealing with excess ballast, and restressing almost all of it.
It's all go on our railway!
A quickie on Tuesday.
A call from our PWay manager, who can help with replacing two concrete sleepers on the Broadway extension? They are not urgent, but with broken hoops they keep appearing on the faults list, and now that we have contractors on site lifting the track this is a good time to do the change.
Three of us answered the call.
We picked up three replacement concrete sleepers from Stanton yard, and then entered the trackbed at Laverton.
This is where the 'Broadway extension' started in 2015, with this long straight line. The little dot in the distance isn't a speck on your computer screen, but a hot air balloon. It barely moved. It was ice cold, but warm under the sun.
Although we have laid thousands of concrete sleepers on this Broadway extension, in the last 10 years at least we have never actually changed a concrete sleeper.
Now two have been found, quite close together at MP6 II, that have broken hoops. Not a major problem, but now is a good time to deal with them.
How easily would they come out, in the hands of a team of 4?
The answer was, OK, not too bad. We managed it with bars and a set of chains, wuth three of us pulling. The frozen ground was really the bigger problem, but we got there, and the replacements back in.
Afterwards we robelled the spot, although a tamper will pass through here soon, once the stressing has taken place.
Our two Robels are identical, and sometimes there is an issue with one, and not the other.
How to tell them apart?
We have given them names....
We were working alongside a field with two horses in it, about 100 yds away. After a while a lady came along and said we were frightening the horses with our laughter and orange jackets (!).
Can you really expect to dictate to your neighbour what colour clothes he should wear, and forbid the laughter?
Here is a detail of a sleeper with a broken hoop, on the right. It's not an uncommon problem, the hoops are fairly fragile.
We now have a growing supply of concrete sleepers with small defects. We gave 70 to the loco dept. to build a new coal storage, but what to do with the rest?
We did one sleeper before lunch, and the other just after.
Here is Andy just robelling the second sleeper.
Job done, we packed up and headed further north, where contractor vehicles could be seen in the distance, at Little Buckland bridge.
There was an impressive suite of construction machinery, including a dumper, 360 excavator, a large bulldozer and a welfare vehicle.
The bulldozer was particularly impressive. Its blade was fitted with apparatus for assuring a level ballast bed, presumably some sort of laser.
Immediately below all this were two more horses.
Stressed by all that orange and noise?
Certainly not! They were curious about all those human beings, and accepted a little pat on the head from one of the contractors.
Friendly contact, despite the orange. |
The big bulldozer rumbled by....
.... as the horses grazed peacefully immediately underneath.
Back at Winchcombe we found a large hole in the yard. There's been a water leak, and a lot of effort was expended in trying to find it. A few days ago we were finally successful - there was no evidence on the surface - and the outcome is a new stretch of water pipe near the bottom end of the yard, and the leak fixed.
Wednesday with the Usketeers.
Good progress today, we got one side fully slated, and made a start on the other.
There's no Jules - now what??? |
We still had a corner of the Malvern side to do, and the top row, which needs two layers of slates.
No Jules today, due to family circumstances. We'd have to manage without.
However, as it was too damp to strip the guttering of old paint, yours truly switched roles and became Dave's assistant. Paul would make a start on setting out the other side.
Things got interesting after that, and we learned the new skill of cutting a slate in half without any form of saw.
You then break off the bit you don't want, and hey presto! One end slate of the right size.
Another way of cutting off the unwanted bit is to 'saw' along the holes with a trowel.
Paul showed us both. In the end we not only cut the slates on the end, but also all the half slates needed along the ridge, 17 of them. All broke just where we wanted them to.
In this next picture we have fitted all the end slates, and the Malvern side roof is basically done, except for those slates along the ridge.
Paul also fetched up a ridge tile, to make sure it would sit properly along the upper ends of the topmost slates.
So here is Dave nailing down the last row of full sized slates, with another row of half slates to go on top of that to finish off the side, except for the bit around the chimney, which we will do at a later stage.
A bit later we see Dave, nailing down the topmost row of half slates.
We called him Norman - Norman Nailer....
Beneath, we had him that walked the slates up to the scaffolding.
We called him Slater - Slater Walker....
We do enjoy ourselves.
It was briefly sunny as we were about to break for lunch, but the forecast predicted rain at 1 o'clock, so we decided to have a late lunch and sit out the rain.
Paul here is working out the battens for the Cotswolds side. On this side we are using the former Exminster box slates, which are slightly smaller, so the spacing of the battens has to change. You won't be able to see the difference, as you can't see both sides at once...
As we are all busy the rest of the week, we're working just the one day this week, but next week we hope to be able to do a double turn again. There's a lot still to do with the scaffolding in place, including building up the rest of the chimney. We've got it rented for 2 months in principle.