Friday at Broadway.
The day started with a puzzle. On Thursday Neal noticed that the station's exterior lights were on at four o'clock - 23 lightbulbs in all, including down the station approach. They were still on when he looked on the webcam at 18.00.
Checking with a station staff member, we were told that they would go out by themselves, as they were on a timer.
On his way home from a pub meal, Yours Truly checked at 22.00hrs, and all the lights were still on. The station was a blaze of lights.Friday morning, on arrival, they were still on, but were eventually turned off at 11.00am by station staff.
During the week John managed to instal another arch, the fifth of the 8 along the front. Three to go, then the rest of the front wall (mostly the corbelling.)
Neil spent the day working on the north end.
Here he is cutting a profile into the end of the fascia board, so that the second cross member of the triangular end can be fitted.
![]() |
| The profile that Neal cut into the end of the fascia board. |
Next, Neal cut a sloping joint into the LH end of the board, so that it could be mated with the similar board on the other side. Here he is doing a test fitting.
This is what that board looks like when fitted - temporarily. Unfortunately it is lower than the already low truss, so with the board in place we are now obliged to pass under the two on our hands and knees.
During lunch we were joined by a young local artist, who it turned out, was also a Trust member and had known Fred Lea. His speciality is landscapes, unfortunately not yet charging steam locomotives.
You can see him on the footbridge, chatting to Neal.
Given the fine weather currently Neal asked us to undercoat the steel structure - again. Let's hope it stays dry for that.
The sun sets early now, so this is Neal at about 15.30 with the board in place.
Although bolted on at both ends Neal has made two additional brackets to stabilise it against the truss. One can be seen +/- in the middle of the picture.
These brackets are the sort of thing Neal would make with the remaining lengths of angle that were inadvertently skipped at Toddington.
Four PWayers were out to do some spot ballasting, using dumpy bags.
The bags had been loaded ready for use and lined up alongside the track at Gotherington Skew yard.
Once enough bags had been loaded on to STEVIE's trailer they headed south, where some unsupported sleepers ends had been identified.
Doing this with the bags instead of fully loaded Dogfish is much more practical, and cheaper.
The bags can be lifted one at a time, and the contents dropped where they are most needed.
We use second hand dumpy bags. Some have a tied up opening at the bottom and can be re-used. Others, like this one, need to be cut at the bottom to get the ballast out. They are then discarded.
The dumpy bags in any case have a finite life, as they quickly degrade in the sunlight.

On the previous Friday a small gang with STEVIE went to Gotherington Skew.
Here they unloaded the last of the 64 sleepers removed from Stanway viaduct that were at first stored at Toddington. It's part of the 'tidy up' operation by the greenhouse there.
STEVIE then took the rail lifting beam and placed it on the ELK wagon at Hunting Butts. This is part of a proposed rail drop that is on the cards. On the way back the little group rearranged several rails that were lying lineside, all part of a juggling act for future operations.
Wednesday on the PWay saw the gang change 3 timbers in Toddington yard, amongst a number of other smaller jobs.
This is one of the timbers, and it shows three faults: It is split, the throughbolt (on a 1902 chair!) has come loose, and the chair has dug into the wood, softened by decay.
While the top of a timber might look OK, the underside definitely wasn't. Sometimes second hand timbers would be turned around, and re-used.
Here one of our new electric sleeper drills is being used. We are very pleased with these tools, bought by donations from kind readers to our tool fund, as well as the remarkable success of Andy's rail end selling.
The main gang on Wednesday was at MP 8 1/2, where the ballast boards around an underbridge were insufficient, due to the track level slowly rising after tamping.
Sunday, a quick go on the paint.
We've kept a careful eye on the weather, and the forecast for Sunday afternoon suggested there would be a few hours of sun, after a foggy start.
The forecast showed a change from 'FOG' to 'MIST' mid morning. A subtle difference. In the end we dropped in at 14.00, after the first rays of the promised sunshine appeared.

After an hour's sunshine this was the state of the steelwork. Wet ! Luckily we had thought to bring a towel, so we rubbed down the areas of interest, and waited for the sun to dry those out completely.
We did about an hour's worth of painting, but it was hopeless really. Unless we get several days of hot sunshine, any more painting looks unlikely until the spring.
As we painted a gentleman called up from the platform to offer us a takeaway tea. How kind ! It turned out to be a supporter, blog reader and donor. We had a nice chat on the footbridge.
Soon the sun went down again, but now we are moving into the season of early evening winter sun, and a glint on the incoming trains.
It was 3850 today, steaming off into the setting sun.
Beautiful.
Wednesday with the Usketeers.
All four of us today, on a cold and blustery day. No heating in the Pagoda, and the insulation capacity of Edwardian corrugated iron was discovered to be low. We kept warm with hamburgers.
Before arriving at Gotherington we had a short detour to Winchcombe. This was to source some second hand 100mm pipe, and a few assorted planks that might fit the gaps in floor of the ground frame hut.
We arrived on site an hour late, beyond the traditional coffee, cake and the usual 'organ recitals' of our various age related ailments.
The lads were already hard at work, here fitting the first of the new boards to the front of the cabin.
While Julian carried on with that, Paul and Dave were cutting the skirting boards to length. We hadn't even finished putting the primer on!
In a surprisingly short period of time Julian was up to the penultimate board in the corner, banging his hammer loudly.
Inside the cabin it was like being inside a drum, causing some unkind remarks being addressed to the hammerer outside.
In the foreground is one of the scavenged second hand lengths of wood, that was found to be perfect for the missing floorboard here.
In the above picture you can also see evidence of the knotting carried out at the start of the day.
Paul and Julian then measured up for the last length of board, and can be seen here cutting it to size.
And there you go - it fitted perfectly.
After a bit of professional hammering....
The front still needs putting in primer, but at least it's knotted now. Bryan will put the final coat on himself, he likes to be in control over the actual colour.

It's in - sort of. Where's that hammer?
Lunch time was Paul's opportunity for some sophisticated gastronomy. (not)
A large frying pan was produced, 4 hamburger patties, and a packet of cheese slices.
There was hamburger relish, and even some gherkin slices ! Mouths were beginning to water...

In the meantime Jules had dug a trench for the 100mm drain pipe to be laid, underground. The far end still looks a bit high, maybe excavate a bit more next time, to continue the fall to the edge of the embankment.

In the background you can see the welcoming mess coach. With only 10 degrees C and a biting northerly wind, it was certainly very welcome. Shame only that without running services we can't go to the Coffeepot for the traditional end of the day cuppa.




































It was great to see the progress first hand and to have a very interesting chat with Neal and yourself. I’ll have to donate a painting of the station once complete. Regards, GiosuΓ©
ReplyDeleteNice to you, do come again.
DeleteIf we can help you with an old photograph as a subject, then let us know.
I watched a lot of the cinstruction of the wuudwork going on, on the Broadway webcam, and was amazed at the speed of the progress! Also, John's toing and froing, as he progressed the brickwork.
ReplyDeleteI saw what you mean, about having how to kneel down to get under the end truss.
It seems rather lonely now without the trains coming and going at the station.
I now have a new, (to me), Chihuahua doggie, as after I lost my one of 12 years in July, the house seemed soo empty. This one is a 'tea cup' variety, and cm#ame to me from London, via a nrighbours family down there as they did not have the required time for the dog and were looking for a new home for her. On arrival here, she immediately came and sat on my lap. So she chose me, not the other way around! She is 3 years old, looking like 3 months old, and soon fitted in. She is friendly and very good with people and other dogs, and follows me all around the house. So that's a win, win situation!
Great work on the groundframe Box at Gotherington. Bryan must be very pleased.
Regards, Paul. πππππ
Most people have probably forgotten a requirement from the Council in their planning approval for Broadway Station concerning lighting. It says "All lighting shall be switched off after the daily use of the buildings finishes. All security lighting shall have a PIR sensor on a timer. There shall be no lighting on the track bed area and it should be directed away from any Bat Roosting sites. Reason - In the interests of the biodiversity of the site." You can find the planning application on the Wychbold District Council Planning website; search for application W/13/01373/PN. Incidentally, the CCTV cameras evidently use infra red illumination so that the track and platforms seem to be dark to human - and presumably bat - eyes.
ReplyDeletePeter The spiders enjoy the infra red light that's why all the spiders webs keep appearing over the camera's view.
DeleteNeal
Great blog Jo. I did wonder how you would get the wooden facing boards and dagger boards fitted on the platform face without using the 4 foot. A joint possession is a good way forward.
ReplyDeleteGreat up date as ever, lets hope we get a dry end to the year to aid progress. Given the moving around of materials are we able to know what the plans are for p way work over the closed season, or is there no big projects planned. Just wondered also if its the plan to extend platform 1 at Toddington, similar to P2?
ReplyDeleteThe cabin at Gotherington is looking infinitely better than when the Usketeers first got to it! Hopefully, it will be good for quite a few years, now.
ReplyDeleteExcellent timing on S&T's part, on the two week section block; that will make working on the Broadway P2 platform side fascia boards _much_ more convenient.
Grateful if you'd refrain from making health and safety comments via the blog.
ReplyDeleteLet's keep it positive!